Tech Packs / Guide / Bill of Materials (BOM) Guide
What Is a Bill of Materials (BOM) in a Tech Pack?
Alan King Group
What is a bill of materials (BOM)?
A bill of materials is the itemized list of every physical component that goes into a garment - fabric, thread, labels, zippers, buttons, drawcords - each with a supplier reference, placement, and quantity, so the factory can source everything before cutting starts.
Think of it as the shopping list for your garment. A tech pack's flats show what the garment looks like; the BOM lists everything that physically has to be bought, sewn, or attached to build it.
What does a complete BOM line item look like?
A complete BOM line item names the component, its exact specification, the placement on the garment, and the quantity needed per unit - a vague description like "buttons" without size, material, and color is not sourceable.
| Field | Example |
|---|---|
| Component | Main fabric |
| Spec | 100% combed cotton, 280 gsm, stone wash |
| Placement | Body, sleeves, hood |
| Color / Pantone | TCX 19-4118 (navy) |
| Quantity | ~1.8 yds per unit |
What components does a BOM usually cover?
A typical apparel BOM covers main fabric, lining, interfacing, thread, labels (main, care, size), trims (zippers, buttons, drawcords, elastic), and packaging materials - anything a factory has to physically source or produce.
- Main fabric and any secondary fabrics (panels, contrast pieces)
- Lining and interfacing, if used
- Thread type and color
- Labels - main brand label, care label, size label
- Hardware - zippers, buttons, snaps, drawcords, eyelets
- Packaging - polybags, hang tags, boxes
What happens when a BOM is incomplete?
An incomplete BOM stalls the production timeline - the factory cannot quote accurately or source materials until every component is specified, so missing lines translate directly into lost days waiting on email replies.
The most common gaps are unspecified trims (a drawcord with no length or material) and missing label specs. Both are quick to fix up front and expensive to fix mid-production.
From BOM to bulk order, one team
AKG's AI generator drafts a starting BOM from your reference images, and our manufacturing team fills in the sourcing details during sampling - so your BOM goes straight into a real purchase order, not a document you have to shop out separately.
More Tech Pack Guides
Ready to Turn This Into a Real Garment?
AKG (Alan King Group) is a fashion production studio, not just a document generator. Draft your tech pack free with our AI generator, then we take it through sampling and into bulk production - real Pantone TCX color accuracy, Made in USA options, and real purchase orders. One team, one thread, from concept to factory floor.
Start Your Free Tech PackSee the Manufacturing Pipeline